Gurgaon, Haryana · Serving Delhi NCR & India Mon–Sat, 8 am–9 pm · Sunday closed
Illustration: the Dwarka Expressway carriageway with its 'Welcome to Dwarka Expressway' gantry.

Photo: Baba Ovian, CC BY-SA 3.0, via Wikimedia Commons

Packers and movers · Dwarka Expressway, Gurugram

Packers and Movers on the Dwarka Expressway, Delhi to Gurgaon

The Dwarka Expressway joins Delhi's Dwarka and airport side to Gurgaon's newest tower sectors. Maxx Relocation's head office is in Sector 110, with a branch in Sector 99A, and we move families along it, often from Delhi into Haryana, with a truck that meets Delhi's entry rules and a planned route from the right exit to your tower gate.

Get a Free Dwarka Expressway Moving Quote

Quick. Easy. No obligation.

Move type

We use your number only to call you about this move. Privacy policy

  • Careful packing
    & labelling
  • Trained packing
    crews
  • Door-to-door
    service
  • Across India
    & abroad

Area overview

Packers and movers on the Dwarka Expressway: from the elevated road to your gate

Illustration: a moving crew packing and carrying cartons in an apartment
Illustration. Photos of our real jobs are in the gallery.

The expressway, numbered NH-248BB, runs from Shiv Murti near Mahipalpur in Delhi to Kherki Daula on NH-48. According to the Press Information Bureau, its 19 km, eight-lane Haryana section was opened on 11 March 2024, built in two packages: from the Delhi–Haryana border to the Basai rail overbridge, and from Basai to Kherki Daula. The 10.1 km Delhi section, past Dwarka Sector 21 to the border, followed in August 2025. In Gurugram it passes Sectors 102 to 106 and 109 to 113, and the wider belt it serves runs from Sector 99 to 115.

Most homes along it are in towers completed in the last few years, and civic work is still catching up. In January 2025 The Tribune reported that GMDA would lay a master sewer network for Sectors 99 to 115. A year later, Swarajya reported that nine sector roads between Sectors 99 and 112 were still not linked to the expressway, held up by green-belt land that had not been acquired. In May 2026 The Tribune reported that internal and master roads in Sectors 99 to 115 had worn badly under traffic, with GMDA planning repairs that include the parallel service roads. Developers' own pages place Godrej Summit in Sector 104, Godrej Meridien in 106, Sobha City in 108 and Mahindra Aura in 110A. Metro work is coming as well: GMRL's new line includes a 1.85 km spur from Basai village to the expressway.

So the straight line on the map is not always the way a truck reaches your gate. The main road is elevated, and your sector road may join it through a service road or a longer loop. We plan the exit and the last kilometre before the day, from our head office at E-94, New Palam Vihar Phase 2, Sector 110, and our branch at Shop No. 26, Sector 99A, Gopalpur. Moving from Delhi, see our Dwarka, Delhi page; for the sectors beyond Kherki Daula, see New Gurgaon; and for the rest of the city, Gurgaon.

Office hours
Mon–Sat, 8 am–9 pm
Sunday closed
Registered for GST
GSTIN 06DVFPR4762F1ZC
Our office
Gurgaon, Haryana 122017

Nearest office to Dwarka Expressway

Our head office, Sector 110

E-94, Gali No. 1A, New Palam Vihar Phase 2, near Dwarka Expressway, Sector 110, Gurgaon, Haryana 122017

Local know-how

Moving Along the Dwarka Expressway

A new road, new towers and a state border between them.

On the ground in Dwarka Expressway New Gurgaon & Dwarka Expressway

  1. The right exit

    The elevated road only lets traffic off at set points. We match your sector to the exit and the service road that reach your tower with the fewest turns.

  2. The last kilometre

    Where a sector road is not yet linked, the truck takes the service road or a longer loop. Rain matters too: in September 2026 Business Today reported traffic slowed by waterlogging in the expressway tunnel.

  3. Delhi's hours for goods vehicles

    Delhi restricts when goods vehicles may use many of its roads. For a move from Delhi, we set the departure so the truck is on the move inside the permitted hours.

  4. A truck Delhi will let in

    Since November 2025 Delhi has barred older BS-III commercial vehicles registered outside the city, and the rules for BS-IV goods vehicles tighten at the end of October 2026. We send a vehicle that complies.

  5. Two-wheelers ride on the truck

    Slow vehicles, including motorcycles and scooters, are kept off the expressway's main carriageway. Your bike can travel on the truck, or on a carrier through our vehicle transport service.

  6. Tolls on the route

    The toll plaza at Bijwasan, opened in November 2025, and Kherki Daula at the NH-48 end both sit on this corridor. We plan the route with them in mind.

Finding your way

Which Fixed Points Along the Dwarka Expressway Shape a Move?

From the Yashobhoomi end in Delhi to the cloverleaf at Kherki Daula, a route along the corridor is planned around these points.

  1. Yashobhoomi and the Delhi end

    The Delhi end ties into more than the airport. When that stretch opened on 17 August 2025, Daily Jagran said it connects Yashobhoomi with both the Blue and Orange Metro lines, the Dwarka cluster bus depot and a railway station planned at Bijwasan. For family members arriving by train or Metro ahead of the truck, the convention centre is a simple place to meet.

  2. The airport tunnel

    The tunnel and underpasses on the Delhi stretch first opened for a trial in late May 2025, only between noon and 3 pm. NativePlanet reported that two- and three-wheelers, tractors with trolleys and water or gas tankers were kept out of it. It is the direct run between the Gurugram towers and the airport side.

  3. Bijwasan toll plaza

    The plaza charges vehicles that cross the Delhi–Haryana border on the expressway. When tolling began, The Tribune reported on 12 November 2025 that NHAI offered a monthly pass to residents within a 20-km radius and had set up registration camps near the plaza. A household that has just moved into a tower nearby can apply for its car once the new address is on paper.

  4. Kherki Daula cloverleaf

    At the southern end the expressway meets NH-48 at a cloverleaf interchange that, according to Wikipedia, also takes in the Southern Peripheral Road. That makes it the turn for a load bound for Sohna Road, Golf Course Extension Road or the Jaipur side.

Homes we move

Tower Clusters and Possession Waves Along the Corridor

Property consultancy JLL treats the expressway and New Gurugram as one housing market, covering Sectors 79 to 113 plus 36A and 37D. In a March 2024 release it counted over 11,000 apartments completed there in 2023 alone, with 29,742 more still being built. Those figures leave out villas, row houses and plots, so they describe the tower side of the corridor.

Handovers on that scale come in waves. When a large project starts giving possession, several towers can be taking in new families at once, all queuing for the same service lifts, the same loading bay and the same gate. Ask the facility office how many move-ins are already booked for your preferred weekend, and whether fit-out crews are still using the lift.

On the ground

Practical Points Before Moving Along the Expressway

  • Name the service road, not just the expressway

    Wikipedia describes the road as sixteen lanes in all: eight on the elevated, grade-separated deck and eight on the service roads beside it. No society gate opens onto the deck, so the address you share should say which service road or sector road leads to your gate.

  • An entry from outer Delhi via UER-II

    The Delhi stretch was built as two packages: a 5.9-km first package between Shiv Murti and the Dwarka Sector 21 road under-bridge, then a 4.2-km second one on to the border, where it meets Urban Extension Road-II, as Daily Jagran set out. So a load from the outer parts of Delhi has a way onto the corridor that does not begin at Mahipalpur.

  • Lane closures for repairs

    Repairs can close lanes for days at a time. In May 2025, after a Central Building Research Institute study found seepage in the underpass near Sector 102, NHAI shut lanes there in phases from 22 to 29 May, NativePlanet reported. Look for any current closure notice on your route before you fix the date.

Our services

Moving Services in Dwarka Expressway

All services
Illustration: a packer stretch-wrapping a sofa in an apartment

Household Shifting

Door-to-door packing, loading and delivery for a full home or just a few cartons.

Illustration: a car being driven up the ramps into a covered car-carrier truck

Car & Bike Transport

Covered car carriers and trained drivers to move your vehicle between cities.

Illustration: wrapped goods on pallets inside an open storage unit

Warehousing & Storage

Palletised storage watched by CCTV and motion sensors, for a week or a year.

Illustration: a moving crew loading wrapped furniture and cartons into a covered truck outside an apartment block

Domestic Relocation

City-to-city moves across India, from the first carton to unpacking at the new home.

How it works

Moving Made Simple

Four clear steps, from your first call to the last carton unpacked.

  1. Get a quote

    Share what is moving and where. We check volume and access, then give you a clear written quote.

  2. We pack

    Cartons, wrapping and labels matched to each item: furniture, glassware, electronics and files.

  3. We move

    Trained crews load a vehicle sized to your goods and drive it to your new address.

  4. We deliver

    Goods are unloaded, placed room by room and unpacked if you want us to.

Get a free quote Call +91-9599701278

When to move

When Is the Best Time to Move Along the Dwarka Expressway?

Rain hits the service roads harder than the deck. On 1 August 2025 Curly Tales reported service roads near Sector 104 under several inches of water, with NHAI saying that runoff from nearby colonies drains onto them and has to be pumped out. The same report said HSVP had not yet handed over the main drainage spine for Sectors 81 to 111, and that GMDA's drains for Sectors 68 to 75 and 112 to 115 had been given until August 2026. For a July or August date, keep a spare day in reserve.

Early summer brings the opposite problem. The Palam observatory, at the airport end of the corridor, recorded 48 °C on 10 June 2019, its highest June reading, while the all-time record of 48.4 °C was set there on 26 May 1998, according to The Wire. In May and June, finish loading before midday and do not leave medicines, candles or electronics sitting in a parked vehicle in the afternoon.

Gurugram to Bengaluru, Pune and Other Cities: Distance and Transit

Distances are approximate road distances. Your quote confirms the transit time for your date and load.

Pricing guidance

What decides your moving cost in Dwarka Expressway

On the Dwarka Expressway, the route from the right exit, the Delhi leg and the new tower's access decide most of the quote.

Delhi or Gurgaon start
A move that begins in Delhi has to fit Delhi's goods-vehicle hours, which can mean an early or late start.
Exit and last kilometre
A sector road that joins the expressway by a longer loop adds drive time at both ends.
Lift access in a new tower
Recently handed-over towers may share lifts with fit-out crews, which slows loading.
Tolls and distance
Tolls on the route and the distance between homes are part of the transport cost.
Moves within Gurgaon. Indicative ranges in rupees, October 2026. Your written quote depends on your exact goods, floors, access and date.
Move1 BHK2 BHK3 BHK
Within Gurgaon₹4,500–7,000₹8,000–12,500₹12,000–15,000

Get an exact quote

Tell us three things:

  1. What is moving
  2. Both addresses
  3. Your moving date

You get a written quote, with no obligation to book.

Get Exact Quote

FAQ

Moving in Dwarka Expressway: Questions

Still have a question?

Call or WhatsApp us and talk it through with our team.

In Gurugram the expressway passes Sectors 102 to 106 and 109 to 113, with more sectors from the 99s to 115 linked to it by sector roads. Tell us your sector and tower when you book, and we plan the exit that reaches it.

The main-carriageway ban published by Delhi Traffic Police covers slow vehicles such as two- and three-wheelers and tractors, and goods trucks are not on that list. We still check current traffic advisories before the day, and use service roads for the final approach.

Yes. It is a short move across the state border. We pack in Delhi, leave inside the permitted hours for goods vehicles and unload the same day in most cases.

Yes. The Tribune reported that tolling began at Bijwasan in November 2025, and the Kherki Daula plaza sits at the NH-48 end. Tolls on your route are part of the transport cost.

Two. Our head office is in Sector 110, in New Palam Vihar Phase 2, and our branch is at Shop No. 26, Sector 99A, Gopalpur. Phone numbers are on the contact page. For a single sector, see our Sector 110 page.

No. It only changes the route. The truck leaves the expressway at the nearest suitable exit and reaches your tower by the service road or other sector roads. We check the way in beforehand.

Ready when you are

Moving from
Dwarka Expressway?

Share your building, floor and date. We will call you with a written quote.